Operations & Maintenance

US Coast Guard Station Burlington
Fuel Systems Repairs
Burlington, VT

Watermark completed paving and fuel system repairs at U.S. Coast Guard Station Burlington to address damage from Hurricane Irene. The work included removal and disposal of existing dispenser building, and removal and disposal of existing fuel house including 1,600 gallon diesel fuel tank, The concrete floating dock on existing steel piles was removed. New concrete curbing, sidewalk and pads were installed. New 1,000 gallon fuel (gasoline and diesel) storage tanks and associated dispensing systems were installed. The project also included installation of pipe bollards at new fuel storage tanks and provision of new 12-foot by 10-foot Hazmat locker.

fuel-systems

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','//www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-62418238-1', 'auto'); ga('send', 'pageview');