Sewer Force Main Condition Assessment and Repair
Portsmouth Naval Shipyard
Kittery, Maine
Watermark was awarded a Maintenance and Construction Job Order Contract (MCJOC) by the U.S. Navy to provide facilities and public works related construction, repair and maintenance services including planning, engineering and construction for federal installations located in Maine, New Hampshire, New York, Vermont, Massachusetts, Connecticut and Rhode Island.
This project consisted of several tasks including inventorying the existing conditions of the sanitary sewer collection system, conducting continuous flow monitoring including salinity and pH monitoring, monitoring rainfall and tidal fluctuations, analyzing and categorizing data flow, performing manhole inspections and preparing a Sewer System Evaluation Survey Report to summarize the findings and recommendations of the field investigation and data analysis.