Storage Tank Repairs Design
Veterans Affairs Medical Center
Brockton, Massachusetts
Watermark prepared design documents for repairing and upgrading a 300,000-gallon elevated water storage tank. The design efforts include the following features: removal and replacement of interior and exterior coating system; provision for containment and environmental protection system; removal and replacement of tank appurtenances such as ladders, guards, gates, railings, and manways; upgrade tank valves and alarms; and lightning protection and obstruction lights. Watermark prepared Design submissions (architectural, civil, electrical, structural, and mechanical engineering disciplines), coordinated independent technical reviews, and participated in design review meetings.